At 0:02, the wooden deck and angled metal supports are clear beneath the rusted pump machinery, with pale ice filling the lower right of the Guerrero Negro frame and no visible people.
The frame emphasizes the platform structure and equipment placement over the frozen surface. (2s)

Still Image License

The frame emphasizes the platform structure and equipment placement over the frozen surface. · GUERRERO NEGRO BCS MEXICO · 2022 · Frame 3

$49 USD per frame

Native 4K JPEG, 3840 × 2160 pixels

The image shown here is a browsing preview, displayed at up to 144 pixels high. The clean native JPEG is prepared privately and verified before payment. No upscaling.

Still Image License — Royalty-Free Standard

  • AI training prohibited
  • Merchandising prohibited

Read image license terms

The source video is licensed separately.

View source video: GUERRERO NEGRO BCS MEXICO-2022: Pump Station on Snow-Covered Icy Ground

Frame 3 · Published timestamp 2s · 2022 · GUERRERO NEGRO BCS MEXICO

Explore this collection

Color and composition matching within a sample of up to 256 published frames.

Visually similar images

Choose “Find visually similar images” to search the bounded sample.

Other frames from this source

Browse every published frame from this source